TENAX RIVEL System installation procedures
1. Precut the geogrids, shape the steel mesh
formworks and prepare both the hooked bars. After the levelling
and compaction of the foundation soil, place and line up the formworks
connecting each other by mean of a steel or plastic wire.
2. Place the reinforcement geogrids in horizontal
layers perpendicular to the face and along the internal face of
the steel formworks, anchor the grids to the soil by means of
"U" shaped staples and temporarily leave the last portion
of the grids outside the formworks. The last portion of the grid
shall correspond to the total wrapping length (about 1.5 m).
3. Place the biomats on the internal side of
the geogrids at the face and place the hooked bars to fix the
formworks.
4. Place the soil on the geogrids in approximately
0.30 m lift and compacted it until reaching a compaction not lower
than 95% of Standard Proctor; for about 1.00 m close to the face
the compaction shall be carried out by using light hand-held compactors,
like vibrating plates, while the other part of the reinforced
block may be compacted with heavy rollers.
5. Wrap the final portion of the grids, previously
kept outside the formworks, toward the inside; slightly stretch
it and anchor it to the soil by means of "U" shaped
staples.
6. Repeat the phase 1-5 until completion of the
work. Then hydroseed the face and, in case, place on the face
a further biomat so as to hide the synthetics and metallic elements
and to protect the hydroseeding.